Free EIA and DPIA templates
By Phil Swindin, Equality Act 2010 specialist and data, security and AI governance adviser · Last reviewed · Covers England, Scotland and Wales · General guidance, not legal advice
Every template, the screening form and the two registers, with their Word and spreadsheet downloads.
Your free impact assessment toolkit
Every template on this page, free to download, use and adapt. No sign-up, no email address needed.
Start here
EIA and DPIA screening form
One form that tells you whether you need an EIA, a DPIA, or both, and records why.
Download for WordEquality impact assessment
Full EIA template
Nine characteristics, three aims, other lenses, action plan and sign-off.
Download for WordRedundancy and recruitment add-on
Pool and applicant comparisons, and the checks that catch indirect discrimination.
Download for WordData protection impact assessment
Full DPIA template
Every section Article 35(7) requires, in the ICO's order, with a law enforcement prompt.
Download for WordDPIA risk register
Likelihood, severity, measures and residual risk. Opens in Excel or Google Sheets.
Download for ExcelAI, Copilot and supplier add-on
AI tools, Microsoft 365 Copilot, ChatGPT, transcription and cloud suppliers.
Download for WordDPIA register (log)
Track every DPIA, its risk level, advice from the data protection officer (DPO) and review date.
Download for ExcelDPIA policy and procedure
When your organisation does a DPIA, who does it, who signs it off.
Download for WordCompleted DPIA: office CCTV
See what a finished DPIA looks like, step by step.
Download for WordDownload the whole toolkit (Word) Or have it done for you
Files open in Microsoft Word, LibreOffice or Google Docs. Word may say the file was made in a different format: choose Yes to open it, then save as .docx. The two registers download as spreadsheets.
Combined EIA and DPIA screening form
1 to 2 pages| Name of change, policy, service or project | |
|---|---|
| What is changing, and why (two or three sentences) | |
| Who is affected: staff, applicants, customers, service users, public, suppliers | |
| Owner and decision-maker |
| ☐ | Uses personal data in a new or changed way |
| ☐ | Profiling or automated decisions with significant effects on people |
| ☐ | Special category or criminal offence data on a large scale |
| ☐ | Systematic monitoring of people, including staff or a public area |
| ☐ | New technology or AI |
| ☐ | Children or other vulnerable people |
| ☐ | Combining datasets, tracking, biometric or genetic data |
| ☐ | For law enforcement purposes (Part 3 Data Protection Act 2018) |
| DPIA outcome | ☐ Required ☐ Good practice ☐ Not required |
|---|---|
| Reason |
| ☐ | Changes how people get a service, job, pay, benefit or support |
| ☐ | Could affect people differently because of age, disability, gender reassignment, marriage or civil partnership, pregnancy or maternity, race, religion or belief, sex or sexual orientation (in Northern Ireland, also political opinion and having dependants) |
| ☐ | Removes or replaces a way people currently access something |
| ☐ | We are a public body, or doing a public function |
| ☐ | Hard to reverse, or likely to cause concern |
| EIA outcome | ☐ Full ☐ Light touch ☐ Screening only |
|---|---|
| Reason |
| EIA reference and where it is held | |
|---|---|
| DPIA reference and where it is held | |
| Other assessments linked (for example a legitimate interests or EU AI Act fundamental rights assessment) |
| Completed by, role, date | |
|---|---|
| Data protection officer (DPO) and equality lead consulted, if you have them | |
| Agreed by (decision-maker), date |
EIA Template A: Screening record
1 page| Name of policy, service or change | |
|---|---|
| What is changing, in two or three sentences | |
| Who is affected (staff, customers, public, suppliers) | |
| Could anyone be affected differently because of a protected characteristic? Which, and how? | |
| Outcome | ☐ Screening only (no further assessment) ☐ Light touch ☐ Full |
| Reason for the outcome | |
| Completed by, role, date | |
| Agreed by (decision-maker), date |
EIA Template B: Equality impact assessment
Light touch or full| Title and reference | |
|---|---|
| Aim and intended outcome | |
| Decision-maker and date of decision | |
| Assessment author(s) | |
| Options considered | |
| Size of assessment and why | ☐ Light touch ☐ Full Reason: |
| Data used (internal and external) | |
|---|---|
| Gaps in evidence and how they will be filled | |
| Who was engaged, how, and what they said |
| Characteristic | Impact (+ / − / neutral / unknown) | Reason and evidence | Mitigation or improvement |
|---|---|---|---|
| Age | |||
| Disability | |||
| Gender reassignment | |||
| Marriage and civil partnership | |||
| Pregnancy and maternity | |||
| Race | |||
| Religion or belief | |||
| Sex | |||
| Sexual orientation | |||
| Northern Ireland only: political opinion, and people with or without dependants | |||
| Overlapping groups | |||
| Optional: socio-economic, carers, other |
| Could it lead to discrimination, harassment or victimisation, or a failure to make reasonable adjustments? | |
|---|---|
| How could it advance equality of opportunity? | |
| How could it affect good relations between groups? |
| Outcome | ☐ Go ahead, no major impact ☐ Go ahead with changes ☐ Go ahead, impact justified ☐ Stop and rethink |
|---|---|
| Justification (if going ahead despite a negative impact) |
| Action | Owner | By when | How we will know it worked |
|---|---|---|---|
| Does it involve personal data or automated decisions? Is a DPIA needed or done? | |
|---|---|
| Other lenses checked (accessibility, digital exclusion, socio-economic, Welsh language, human rights, consumer outcomes) |
| Author, role, date | |
|---|---|
| Decision-maker: I have read this assessment before making my decision. Name, date | |
| Review date | |
| Published? Where? |
EIA Template C: Redundancy, restructure and recruitment add-on
Use with EIA Template B| Group | % of affected pool or applicants | % of whole workforce | % selected, shortlisted or kept | Gap and explanation |
|---|---|---|---|---|
| Women / men | ||||
| Disabled / not disabled | ||||
| Age bands | ||||
| Ethnic groups | ||||
| Part-time / full-time | ||||
| Pregnant, on maternity or family leave, or back within 18 months |
| Selection or scoring criteria reviewed for indirect discrimination (for example attendance, flexibility, length of service)? | |
|---|---|
| Disability-related absence and reasonable adjustments taken into account? | |
| Priority for suitable alternative vacancies given to anyone pregnant, on maternity, adoption or shared parental leave, or back from it within 18 months of the birth or placement? | |
| Meetings, interviews and tests accessible, with adjustments offered? | |
| Any automated or AI screening tested for bias, with human review? | |
| Outcomes checked by group before decisions are confirmed? |
DPIA Template A: Screening checklist
1 to 2 pages| Project or processing name | |
|---|---|
| Brief description: what personal data, whose, for what purpose |
| ☐ | Systematic and extensive profiling or automated decisions with significant effects |
| ☐ | Large-scale special category or criminal offence data |
| ☐ | Large-scale systematic monitoring of a public area |
| ☐ | Innovative technology, including AI (with any Part 2 item) |
| ☐ | Decisions about access to a product, service, opportunity or benefit, based on automated decision-making or profiling, or using special category data |
| ☐ | Large-scale profiling |
| ☐ | Biometric or genetic data (with any Part 2 item) |
| ☐ | Combining, comparing or matching data from multiple sources |
| ☐ | Invisible processing: data not obtained from the person, without telling them (with any Part 2 item) |
| ☐ | Tracking location or behaviour (with any Part 2 item) |
| ☐ | Children or other vulnerable people: marketing, profiling, automated decisions or online services |
| ☐ | A breach could risk someone's physical health or safety |
| ☐ | Evaluation or scoring | ☐ | Large scale |
| ☐ | Automated decisions with legal or similar effect | ☐ | Matching or combining datasets |
| ☐ | Systematic monitoring | ☐ | Vulnerable people |
| ☐ | Sensitive or highly personal data | ☐ | Innovative technology |
| ☐ | Prevents use of a right, service or contract |
| Decision | ☐ Full DPIA required ☐ DPIA as good practice ☐ Not required |
|---|---|
| Reason | |
| Data protection officer (DPO), if you have one, consulted? Advice | |
| Completed by, role, date |
DPIA Template B: Data protection impact assessment
UK GDPR Article 35| Project aims, and why a DPIA is needed (link to screening) |
|---|
| Nature: how data is collected, used, stored, shared and deleted (attach data flow diagram) | |
|---|---|
| Scope: data types, special category or criminal data, volume, frequency, number of people, retention, geography | |
| Context: relationship with the people, their expectations, children or vulnerable people, any public concern, relevant codes | |
| Purposes: what you want to achieve, the benefits to you and to the people | |
| Controllers, joint controllers and processors involved |
| Who was consulted (people affected, staff, the data protection officer (DPO) if you have one, security, processors, experts), how, and what they said | |
|---|---|
| If you did not consult, or departed from views, why |
| Lawful basis (Article 6) and condition for special category or criminal data (Articles 9 and 10) | |
|---|---|
| Does the processing achieve the purpose? Is there a less intrusive way? | |
| Data minimisation, accuracy and retention | |
| Transparency: privacy information and how people are told | |
| People's rights: access, objection, rectification, human review of automated decisions | |
| Processor contracts and international transfers | |
| Law enforcement only (Part 3 DPA 2018): how the processing complies with Part 3, logging, categories of individuals, and conditions for sensitive processing |
| Source of risk and potential impact on people | Likelihood (remote / possible / probable) | Severity (minimal / significant / severe) | Overall (low / medium / high) |
|---|---|---|---|
| Risk | Measures | Effect (eliminated / reduced / accepted) | Residual risk | Approved? |
|---|---|---|---|---|
| Measures approved by (name, role, date) | |
|---|---|
| Residual risks approved by (name, role, date) | |
| Summary of DPO advice | |
| DPO advice accepted or overruled? If overruled, why | |
| Does high risk remain? ICO prior consultation needed (Article 36)? | ☐ No ☐ Yes, date submitted: |
| Consultation responses reviewed by |
| Actions added to project plan (owner, date) | |
|---|---|
| Equality impact assessment done or needed? | |
| Review date, and who will keep this DPIA under review |
DPIA Template D: AI, Copilot and supplier add-on
Use with DPIA Template B| Which AI tool or service, which version, and who provides it? | |
|---|---|
| Is the supplier a processor, a controller, or both? Is there a contract with data protection terms? | |
| Will prompts, files or outputs be used to train the supplier's models? Can this be switched off contractually? | |
| Where is data stored and processed? Any transfers outside the UK, and on what basis? | |
| What personal data could staff enter, and what stops them entering special category data? | |
| For Copilot or enterprise search: have access permissions and sharing been reviewed so the tool cannot surface documents people should not see? | |
| Could outputs about people be inaccurate? How are they checked before use? | |
| Will any decision about a person be made solely by automated means? What human review and right to contest is there? | |
| Has the supplier tested for bias across groups? Results obtained in writing? | |
| Retention of prompts, outputs, recordings and transcripts | |
| Logging, monitoring and incident handling | |
| Staff policy and training in place? |
DPIA Template F: Policy and procedure
Adapt to your organisation| 1. Purpose | [Organisation] carries out data protection impact assessments to identify and reduce the risks to individuals from processing personal data, and to meet Article 35 of the UK GDPR. |
|---|---|
| 2. Scope | All new or changed processing of personal data, including new systems, suppliers, AI tools, data sharing and monitoring, by all staff and contractors. |
| 3. When | Every project that uses personal data is screened at the start using the DPIA screening checklist. A full DPIA is completed where the screening shows it is required, before any processing begins. Decisions not to do a DPIA are recorded. |
| 4. Roles | Project owner: completes the DPIA. Data protection officer: advises. Information security: assesses technical risks. Senior information risk owner or director: approves measures and accepts residual risk. |
| 5. Method | The nine-step process: identify need, describe, consult, necessity and proportionality, risks, measures, sign-off, integrate, review. |
| 6. High residual risk | Where a high risk cannot be reduced, the data protection officer (DPO), or the person responsible for data protection if there is none, will arrange prior consultation with the ICO, and processing will not start until advice is received. |
| 7. Records | All screenings and DPIAs are logged in the DPIA register and kept for [period]. |
| 8. Review | DPIAs are reviewed when processing changes and at least every [12] months for high-risk processing. This policy is reviewed every [12] months. |
| Approved by, date |
Worked example: completed DPIA for office CCTV
Illustrative| Need | Four cameras at a small office: two inside reception, one on the car park, one on the rear door. Screening: systematic monitoring and staff (vulnerable, because of the power imbalance). Two indicators, so a DPIA is completed. |
|---|---|
| Description | Video only, no audio. Recorded to an on-site recorder, encrypted, overwritten after 30 days. Viewed only by the office manager and one deputy. Footage shared with police or insurers only for a specific incident. |
| Consultation | Staff told and asked for views at a team meeting. Neighbour asked about the car park camera view. Supplier asked about remote access and security. |
| Necessity and proportionality | Lawful basis: legitimate interests (security of staff and property after two break-ins). Less intrusive options considered: better locks and lighting, added as well. No cameras in kitchen, toilets or open-plan desks. Privacy notice and signs at entrances. |
| Risks | 1. Car park camera captures the public pavement and a neighbour's garden (possible, significant: medium). 2. Footage used to monitor staff performance (possible, significant: medium). 3. Unauthorised remote access to the recorder (remote, severe: medium). |
| Measures | 1. Camera angled and privacy-masked to exclude pavement and garden: risk low. 2. Written rule that footage is not used for performance monitoring, access log reviewed quarterly: risk low. 3. Remote access disabled, default password changed, firmware updated: risk low. |
| Sign-off | Measures and residual low risk approved by the director. Advice from the person responsible for data protection followed. No high residual risk, so no ICO consultation. |
| Integrate and review | Measures completed before go-live. A process for handling requests for footage, including from people filmed, added to the staff handbook. Review in 12 months, or sooner if cameras are added or moved. |
Primary sources
Everything on this page is drawn from the law, official guidance and court judgments below.
Equality impact assessments
Legislation
- Equality Act 2010, section 149: Public sector equality duty
- Equality Act 2010, section 150: Public authorities and public functions
- Equality Act 2010, Schedule 19: List of public authorities
- Equality Act 2010 (Specific Duties and Public Authorities) Regulations 2017 (England)
- Equality Act 2010 (Specific Duties) (Scotland) Regulations 2012, regulation 5
- Equality Act 2010 (Statutory Duties) (Wales) Regulations 2011, regulation 8
- Public Sector Equality Duty (Repeal) Bill, 2026 to 2027 session
Official guidance
- UK Government: Public Sector Equality Duty, guidance for public authorities (December 2023)
- EHRC: How to consider equality in policy making, a 10-step guide (England, 2024)
- EHRC: Technical guidance on the PSED, England (updated April 2023)
- EHRC: Specific duties in Scotland
- EHRC: Specific duties in Wales
- EHRC: Artificial intelligence checklist for public bodies in England
Case law
- R (Brown) v Secretary of State for Work and Pensions [2008] EWHC 3158 (Admin): the "Brown principles" on what due regard means.
- R (Baker) v Secretary of State for Communities and Local Government [2008] EWCA Civ 141: a duty to have regard, not to achieve a result.
- R (Bracking) v Secretary of State for Work and Pensions [2013] EWCA Civ 1345: summary of the principles; the decision-maker must know the facts.
- Hotak v London Borough of Southwark [2015] UKSC 30: Supreme Court on the weight of the duty, which depends on the facts.
- R (Bridges) v Chief Constable of South Wales Police [2020] EWCA Civ 1058: duty to check technology for bias.
- McHattie v South Ayrshire Council [2020] CSOH 4: the duty to advance equality of opportunity, and a tick-box assessment after the decision (case report).
- R (Sheakh) v London Borough of Lambeth [2022] EWCA Civ 457: the duty does not require an EIA at any particular moment, or at all.
Other lenses
Data protection impact assessments
Law
- UK GDPR, Article 35: Data protection impact assessment
- UK GDPR, Article 36: Prior consultation
- UK GDPR, Article 83: Fines
- Data Protection Act 2018 (contents, as amended)
- Data Protection Act 2018, section 64: law enforcement DPIAs
- Data Protection Act 2018, section 65: prior consultation (law enforcement)
- Data (Use and Access) Act 2025
ICO guidance
- ICO: Data protection impact assessments (detailed guidance)
- ICO: When do we need to do a DPIA?
- ICO: Examples of processing likely to result in high risk
- ICO: How do we do a DPIA?
- ICO: Do we need to consult the ICO?
- ICO: Guide to Law Enforcement Processing, DPIAs
- ICO: Sample DPIA template (Word)
- ICO: AI and data protection, accountability and DPIAs
- ICO: Video surveillance, including CCTV
European and international
- Article 29 Working Party: Guidelines on DPIA, WP248 rev.01 (endorsed by the EDPB)
- EDPB: Template for DPIA, 2026 version 1 (consultation)
- ICO Article 35(4) list as submitted to the EDPB
- Kenya: Data Protection Act 2019
- Kenya: Data Protection (General) Regulations 2021
- Nigeria: NDP Act General Application and Implementation Directive 2025
- India: Overview of the DPDP Rules 2025 (Government of India)
Regulator change
Last checked: November 2026. Links open the official source in a new tab.
Combining assessments
- Welsh Government: integrated impact assessment with DPIA screening (2026)
- Welsh Government: integrated impact assessment referring to a separate full DPIA
- East Lothian Council: integrated impact assessment form with DPIA signpost
- EHRC: The Public Sector Equality Duty and data protection
- EHRC: Artificial intelligence in public services
- Local Government Association: Responsibly buying AI (equality and data protection)
- EU AI Act, Article 27: fundamental rights impact assessment
- Scottish Government: Impact assessment in governments, literature review
Help for your organisation
The toolkit is free and yours to keep. If you would rather have it done for you, pick the depth that fits the risk. Each option covers an EIA, a DPIA, or both together.
Screening and advice
A completed combined screening form. You will know whether you need an EIA, a DPIA or both, how big, and which lenses apply.
Review of your draft
You write it, I review it and tell you plainly what is missing and what a court, the ICO or a tribunal would pick on.
An EIA or a DPIA, done with your team
I gather the evidence, assess the risks and impacts, and hand back a finished assessment ready to sign.
EIA and DPIA, side by side
For AI, recruitment, monitoring and new services: one screening, one evidence pack and one consultation, producing two linked assessments, one action plan and one summary for your decision-maker.
Your own process
Templates tailored to your organisation, one screening rule for both assessments, and written instructions for the people who will use them.